The province is now leading efforts to reopen the road between Port Alberni and Bamfield. A 1.5 km stretch remains closed because of damage caused by the Mount Underwood wildfire and a timeline is not yet available for reopening.
“Due to the complex nature of the recovery, similar to challenges faced on Highway 4 after the Cameron Bluffs wildfire, the ministry has assumed the lead role for developing a reopening strategy for this section of Bamfield Main Road. Mosaic Forest Management fully supports this approach and is collaborating with the province to restore public access as quickly and safely as possible,” reads a news release from the province.
The news release says a timeline will be established and shared in mid-September to get the section open. Currently. There are hazards including falling rocks, dangerous trees and unstable slopes.
Crews will begin removing dangerous trees and BC Hydro is still working on a permanent repair, after setting up a temporary solution to restore power to west coast communities.
BACKGROUND: Power restored to Bamfield, road remains closed
“In the interest of safety, public access to the closed section remains restricted. Concrete barriers will be installed the Aug. 30-Sept. 1 weekend to block unauthorized entry and allow crews to work safely. Electronic signs will be placed ahead of the closure points to alert drivers and provide space to turn around,” the press release says.
The ministry of transportation and transit says even after the road is open, temporary closures should be expected during adverse weather. These will be managed with gates, which will replace the temporary barriers.
A detour is still available to access Bamfield through Youbou.